Sudano Company LLC

Nationwide US · 5-7 day deployment

Industrial millwright crews for plants and heavy industry.

Millwrights, riggers, machinery installers and precision alignment crews. Plant maintenance and capital project labor. 5-10 day deployment nationwide US — coast to coast.

Live
Sudano · field

On the job · Real crew

Welders, riggers, millwrights — on site.

Industrial fabrication, structural welds, machinery alignment. Our crews bring the precision tools and the safety discipline that plant managers don't have time to babysit.

  • Stick / MIG / TIG welders with certifications on file
  • Laser alignment + dial indicator for rotating equipment
  • Plant outage surge crews — booked 2-8 weeks ahead
0+Workers in pool
0Trades covered
0+States deployed (12mo)
0Hour local dispatch
  • 100% bilingual EN/ES
  • Pre-screened workers
  • E-Verify compliant
  • Workers comp insured
  • Zero OSHA recordables — 2025
  • Nationwide US · 5-7 day deployment

— 01Roles we deploy

From foreman to helper — staffed by skill, not just headcount.

— 01

Millwright

Skilled industrial mechanics for machinery installation, alignment, dismantling and reassembly. Hand and precision tools.

— 02

Rigger

Certified rigging for heavy equipment moves, lifts, hoists and load-bearing transports. NCCCO/ASME-aligned practices.

— 03

Machinery Installer

Conveyors, presses, CNCs, packaging lines and process equipment installation. Anchor, level, align, commission-prep.

— 04

Precision Alignment Tech

Laser alignment, dial indicator, vibration analysis support. Critical for rotating equipment startup and reliability.

— 05

Plant Maintenance Helper

Industrial site labor: lockout/tagout support, parts handling, scheduled outage labor under plant supervision.

→ Request this crew

Average response under 2 business hours

— 02Use cases

When GCs call us for industrial millwright.

  • 01

    Manufacturing plant capital projects (line installs, expansions)

  • 02

    Data center mechanical equipment installation

  • 03

    Food & beverage processing line moves

  • 04

    Power generation and industrial facility outages

  • 05

    Distribution center conveyor and material handling installs

  • 06

    Plant maintenance shutdowns requiring surge labor

— 03Scope · what crews bring

Clear on day one. No surprises on day three.

Included

  • Hand and precision tools (alignment kits, dial indicators on request)
  • OSHA-compliant PPE plus industrial site PPE add-ons
  • ID + E-Verify documentation
  • Insurance + workers comp
  • Lockout/tagout training documentation
  • Bilingual foreman on crews of 3+

Not included

  • Heavy lifting equipment (cranes, forklifts, lulls) — coordinate with your rental
  • Welding services (we can coordinate a partner if needed)
  • Engineering, drawings or commissioning sign-off
  • Hazmat or confined-space rescue (specialized contractors only)

— 07Clients · proof

Trusted by builders nationwide.

Eighty-plus GCs, subs and property managers across 20+ states count on Sudano crews every week.

Brookline Build
Atlas Constructors
Magnolia Group
Peachtree Civic
Northpoint Realty
Cornerstone GC
Sudano sent us a six-man electrical crew in less than a day. We hit our energization milestone two weeks ahead of schedule.
Operations Manager·Southeast GC

— 04Frequently asked

The questions GCs ask before booking.

  • Q.01How fast can a millwright crew be on site?+

    Typically 5-10 days nationwide because millwrights are highly specialized and we route the closest-credentialed pros to your site. For planned outages we lock crews 2-4 weeks in advance for the best fit.

  • Q.02Do you handle precision alignment with laser tools?+

    Yes. Our precision alignment techs use laser alignment kits, dial indicators and vibration analysis tools. Specify required equipment at booking — we either bring it or coordinate with your plant tools.

  • Q.03What rigging certifications do your workers hold?+

    Our riggers follow NCCCO/ASME B30 practices. For jobs requiring specific certifications (signal person, rigger I/II), we confirm credentials at booking and match accordingly.

  • Q.04Can you staff a plant shutdown / turnaround?+

    Yes. Shutdowns are a sweet spot for us — we scale crews up to 30+ workers for short, intense windows. Book 4-8 weeks ahead for best mix of millwrights, riggers and helpers.

  • Q.05Bilingual support on industrial sites?+

    Yes. Bilingual foreman on every crew of 3+. Critical for safety briefings on industrial sites where errors are expensive and dangerous.

— 10Where we deploy

Nationwide US. Coast to coast.

Skilled trades crews deployed across all 50 states via our partner/worker network. Typical timeline: 5-7 days from request to crew on site, anywhere in the continental US.

WestSouthwestMidwestNortheastSoutheastHQ · Magna, UT

Nationwide · 5-7 day

Specific state or city?

Check coverage

— 12Request workers

Tell us what you need.

Average response under two business hours. Crew on site: typically 5-7 days nationwide.

Step 1 of 4

What trade(s) do you need?

Select one or more